Installation
1.Place the bottom main beam, bottom cross beam and corner pieces on a flat place
socket screws to connect them to the columr
2.install the top frame on the column to complete the installation of the main frame
3.Install bottom square pass.
4.Install top square pass,drain trough and drain pipe
5.install the floor.We have cement fiber board and gass magnesium board for the fioor
6.To install the wall panels,we use high- quality rock wool panels.
7.Complete the installation of the wall panels.
8.Install windows and doors.
9.Install waterproof ceiling tiles
10.Install the internal ceiling, Fast LCLto complete the installation
Product parameters
Size |
20ft(5950*2800*2800mm); 40ft(11600*3000*2800mm) |
|||
Steel structure |
Square tube and bending steel plate |
|||
Wall |
50mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet |
|||
Wall color |
White color and optional colors |
|||
Roof |
50mm EPS sandwich panel /rock wool sandwich panel ,0.326/0.376/0.426/0.476mm steel sheet |
|
|
|
Door |
50mm EPS sandwich panel /rock wool sandwich panel,0.326/0.376/0.426/0.476mm steel sheet with lock /optional doors |
|||
Window |
Aluminum sliding door, PVC sliding door with security bar |
|||
Floor |
MGO board /optional floor |
|||
Decoration wall |
Optional : PVC cladding ,WPC cladding |
|||
Electricity |
Optional standard |
|||
Install Time |
4 workers 3 hours |
|||
Wind resistance |
wind speed≤120 km/h |
|||
Earthquake resistance |
Grade 8 |
|||
Snow load capacity of roofing |
0.6kn/m2 |
|||
Live load capacity of roofing |
0.6kn/m2 |
|||
Wall permitted loading |
0.6kn/m2 |
|||
Heat conductivity coefficient |
0.35kcal/m2hc |
|||
Delivery time |
About 15-20 working days |
|||
Container loading |
13 sets/1*40HQ |
Product Display
Installation
1.Place the bottom main beam, bottom cross beam and corner pieces on a flat place
socket screws to connect them to the columr
2.install the top frame on the column to complete the installation of the main frame
3.Install bottom square pass.
4.Install top square pass,drain trough and drain pipe
5.install the floor.We have cement fiber board and gass magnesium board for the fioor
6.To install the wall panels,we use high- quality rock wool panels.
7.Complete the installation of the wall panels.
8.Install windows and doors.
9.Install waterproof ceiling tiles
10.Install the internal ceiling, Fast LCLto complete the installation