What is the installation process of an Apple cabin house?

dji_fly_20230726_165946_0018_1690362642842_photo(1

As a new type of mobile home, the installation process of Apple Cabin House is relatively simple and efficient.

The following are the general steps for installing an Apple cabin house:

Site preparation:

Before installing the Apple Cabin house, it is necessary to choose a suitable location. This site needs to be flat and solid to ensure that the Apple Cabin can be stably placed.

The size of the venue should be determined based on the dimensions of the Apple Cabin building to ensure that the building can be fully unfolded and secured.

20230614_111548

Basic processing:

A significant advantage of Apple Cabin houses is that they do not require a foundation, greatly simplifying the installation process.

But in order to ensure the stability and safety of the house, sometimes it may be necessary to lay a layer of moisture-proof pad or perform other foundation treatments on the ground.

House unfolding:

Remove the Apple Cabin from the transport vehicle and place it on the prepared site.

Use specialized tools or equipment to unfold the house from a folded or contracted state to a fully unfolded state.

Fixed and connected:

Use specialized connectors or fasteners to secure the various parts of the Apple Cabin house together.

Ensure that all connection points are secure and reliable to prevent the house from shaking or deforming during use.

20230418_103934(1)

Installation of supporting facilities:

Install supporting facilities such as doors, windows, electrical circuits, and water supply and drainage systems as needed.

Ensure that all facilities are functioning properly and comply with relevant safety standards.

Acceptance and adjustment:

After installation, conduct a comprehensive inspection and acceptance of the Apple Cabin building.

Ensure the structural integrity and stability of the house, and that all facilities are functioning properly.

If any problems are found, adjust and repair them promptly.

The entire installation process usually takes several hours to several days, depending on the size and complexity of the house, as well as the experience and efficiency of the installation team. Generally speaking, smaller Apple Cabin houses may only take a few hours to complete installation, while larger houses may require longer time.

2024_08_06_18_19_IMG_7592

Overall, the installation process of the Apple cabin house is relatively simple and efficient, and can meet the usage needs in different scenarios. Meanwhile, due to its mobility and flexibility, Apple cabins have become an increasingly popular choice among people.